2020 Pre-Treatment Survey
Whitewater Associates performed a pre-treatment survey of CLP locations on Pike Lake and the Turtle River in early June 2020.
A table in PDF format of all CLP documented along with notes and other information as well as some summary comments.
Four map photos of the CLP finds with labels corresponding to the table.
pike_lake1.jpg – Pike Lake area (wide)
pike_lake2.jpg – Area east of Pike Lake (zoomed in, some overlap with 1)
pike_lake3.jpg – Turtle River midsection (wide)
pike_lake4.jpg – Area east of Turtle River midsection (zoomed in, some overlap with 3)
Coarse Woody Habitat Survey
2020 Post-Treatment Survey
tbd